Case study
Keeping an assembly line moving
No line stoppages in 18 months
The challenge and our approach
A plant producing 900 vehicles a day cannot wait for parts. Rhein Motorwerk needed just-in-time deliveries from 60 suppliers across three countries.
We built a milk-run network with dedicated trucks, a cross-dock beside the plant and an air-charter back-up for emergencies.
Results
0 line stoppages
In 18 months
38 dedicated trucks
Running timed milk runs
60 suppliers
In Germany, Czechia and Poland
4-hour back-up
Air charter when a supplier is late
More results