Vantor Industries lifts plant output by 23%
Lean and automation programme across six plants.
The challenge and our approach
Vantor’s plants were running at 61% overall equipment effectiveness, well below peers, and a planned new plant would have cost $240M.
Our team spent 14 weeks on the shop floor with Vantor supervisors, introducing daily performance boards, quick-changeover methods and targeted automation. Throughput rose 23%, and the new plant was no longer needed.
Outcomes
Result achieved
+23% throughput within the first year.
Joint team
Arcwell consultants working side by side with client managers.
Pace
First measurable impact inside 12 weeks.
Sustained
Results still tracked and reported two years later.
Engagement facts
- Client
- Vantor Industries
- Industry
- Industrial manufacturing
- Practice
- Operations
- Duration
- 16–40 weeks
- Year
- 2025
Arcwell did something no adviser had done for us before: they stayed until the savings were in the accounts.